| Topic | HORIZON-CL5-2027-03-D5-18 |
|---|---|
| Status | Forthcoming |
| Call | HORIZON-CL5-2027-03 — MOBILITY |
| Destination | Achieving sustainable, inclusive, and competitive transport modes (2026-27) |
| Type of action | Innovation Actions |
| Opening | 15 December 2026 |
| Deadline | 14 April 2027 |
| Budget | around EUR 10 million per project · 2 projects expected · EUR 20 million in total |
| TRL at the end | TRL 8 |
| Part B page limit | 40 pages (standard application form; check your call) |
| Template | Work Programme 2026–2027 application form |
Expected outcomes
Projects should contribute to all of the expected outcomes. The topic says: “Project outputs and results are expected to contribute to all the following expected outcomes:”
- EO1 Demonstrate autonomy, of at least 150 nm (or 277.8 KM for inland navigation) using electrical storage as the only energy source, while allowing rapid in-route zero-emission replenishment.
- EO2 Increase the power output, providing beyond 5 MW as peak propulsion power with corresponding grid capacity.
- EO3 Improve systems to increase the number charging cycles combined with high-power charging to suit the operation needs of different ship types and services.
- EO4 Identify the operating profiles and business cases for which electric powered shipping will bring significant improvements taking into account the priorities and provisions of the Fitfor55 package, especially FuelEU Maritime, Naiades III, AFIR and RED.
- EO5 Develop solutions fitting different ship types and their operational profiles and provide roadmaps for replication.
- EO6 Address the degradation and failure in specific maritime operating conditions.
- EO7 Improved lifetime and safe use of batteries in waterborne transport by addressing the operation profiles, degradation and failure modes associated with unique waterborne transport operating conditions.
Expected impacts named in the destination
The wider, long-term effects the destination seeks. Your outcomes feed them; they are not project deliverables.
- EI1 Accelerated uptake of a zero-tailpipe emission ecosystem, with interoperable technological solutions developed at system level (vehicles, infrastructure, user and energy grid) that support the global competitiveness of the EU transport and mobility system.
- EI2 Zero-tailpipe emission mobility solutions developed that are affordable, efficient, user-friendly, inclusive, safe and circular with concepts and technologies that are easy to deploy, considering needs, behaviours and socio-economic conditions of all end-users.
- EI3 Clean mobility solutions for a climate neutral and environmentally friendly and zero pollution mobility with a higher level of circularity.
- EI4 Increased responsiveness of zero tailpipe emission vehicles and systems to diverse societal interests and concerns.
- EI5 Enable breakthrough technologies and innovations that will contribute to the design (addressing also eco-design and circularity principles), manufacturing, maintenance and operations of new generation aircrafts, also powered by renewable energy and sustainable aviation fuels, for a competitive and clean EU aviation ecosystem (including airports).
- EI6 Derisk and accelerate the introduction of new digital technologies (with emphasis on AI) at all levels in the industrial aviation ecosystem, while addressing all safety-related issues in collaboration with the European Union Aviation Safety Agency (EASA).
- EI7 Higher autonomy range in electric and hybrid vessels.
- EI8 Uptake of renewable and low carbon fuels and improved knowledge on the suitability of innovative renewable and low carbon fuels and other energy carriers for waterborne transport.
- EI9 Support the objectives of the European Port Strategy and Waterborne Industrial Strategy, contributing the role of ports as energy hubs, improving efficiency and safety through digitalization, improving the resilience and security of the transport network, as well as increasing the competitiveness of the industrial and technology EU capabilities.
- EI10 Significant reduction of emissions from large vessels due to the merging of energy efficiency and renewable and low carbon fuels.
- EI11 Sustainability of waterborne transport by design, considering air and water pollution, circularity and life-cycle assessments in shipbuilding.
- EI12 Improved safety of seafarers, port workers and the environment.
What evaluators will look for in this topic
Expected outcomes
- Projects should contribute to all of the expected outcomes.
- For each outcome (EO1 to EO7), name who will use or adopt your results (a specific group, not “industry” or “society”), how they get them, and the indicator that shows the change, with baseline, target and date.
- Use the topic's own words for each outcome, so the evaluator can tick it off.
What the scope asks for
Evaluators check the proposal against these sentences of the scope. Answer each one visibly, in the call's own words.
- “Life cycle aspects should be considered by design in the integration and operation of vessels, as well as the end-of-life of batteries, making sure that operations can be performed during the whole expected life of the vessel.”
- “The topic also explores the need to increase the power capability of fully electric vessels, aiming to define scenarios in which the increase of the peak propulsion power is needed to ensure the safety of operations.”
- “Proposals should cover the interface between vessels and port operations addressing the regulatory requirements, including operational procedures.”
- “Proposals should address all the following aspects:.”
- “Demonstrations should also consider baseline reference which are already state of the art.”
- “Identifying the operational profiles and services that require higher energy output for safe and effective operation, developing solutions and modelling scenarios to ensure safe and efficient energy management and navigation taking into account the battery pack and recharging possibilities.”
- “Furthermore, projects should consider life cycle aspects by design and address the end-of-life of batteries to ensure full electric operation during and beyond the planned operation of the vessel.”
- “This should build on established safety guidelines and requirements such as the Guidance on the Safety of Battery Energy Storage Systems onboard ships (from the European Maritime Safety Agency – EMSA) and the requirements for fixed and swappable batteries on inland vessels (from the European Committee For Drawing Up Standards In The Field Of Inland Navigation – CESNI), as applicable, and contribute to their applicability to a wider scope of…”
- “Furthermore, recommendations for improving the guidelines and extending them to the demonstrated new battery installation solutions should be presented.”
- “Regulatory aspects for the pertinent safety-critical ship systems as well as fire safety solutions for the battery room should also be addressed.”
- “In addition, the recommendations should also consider how integration of the safety considerations affects the overall operational planning and economic assessments.”
- “The plan for exploitation and dissemination of results should identify adequate business cases and provide roadmap for the replication and deployment of the proposed technology, including plans for scalability, commercialization, and deployment.”
Conditions that shape the proposal
- Part B, sections 1–3: 40 pages (standard application form). Text beyond the limit is not read; tables and figures count.
- TRL: the topic expects TRL 8 by the end of the project. State where you start and the evidence for it.
- Innovation action: evaluators expect a plausible path to commercialisation and named first users or customers.
- Other Eligible Conditions: “In line with the “ restriction on control in innovation actions in critical technology areas ” delineated in General Annex B of the General Annexes, entities established in an eligible country but which are directly or indirectly controlled by China or by a legal entity established in China are not eligible to…”
Impact pathway and traps
- The scope expects pilots or demonstration. Name the sites, the partners who run them and what is measured there.
- Life-cycle or safe-and-sustainable-by-design assessment is expected. Name the method and where in the work plan it runs.
- Market uptake is part of the scope. Evaluators look for a credible route to market with named first adopters.
- Policy or regulation is in scope. Name the policy owners you will reach and what you will give them.
- Keep outputs, outcomes and impacts apart: what you deliver, what changes when others use it, and the long-term effect.
- For each destination impact you claim, show which of your outcomes feeds it. Destination impacts are long-term effects, not project deliverables.
- Name the barriers outside the project (regulation, markets, user behaviour) that could block uptake, and what you will do if they do.
- Section 2.3 (the summary canvas) is optional on this call; the old split into scientific, economic and societal impact is no longer required.
The scope, as published
This topic aims to improve the suitability of fully-battery-electric operation of ferries, short sea shipping, offshore and inland vessels, considering the services they provide, their operation profiles and the possibilities to interact with charging infrastructure. Aspects like increasing the autonomy range of operation and fast charging are a crucial element for short sea shipping and inland routes with short docking periods. Fast charging may also put added strain on batteries in terms of output and durability. Optimization of the onboard electrical architecture and battery chemistry as well as optimized battery monitoring and management systems and more extensive training of crew can to some extent address this challenge. Life cycle aspects should be considered by design in the integration and operation of vessels, as well as the end-of-life of batteries, making sure that operations can be performed during the whole expected life of the vessel. The topic also explores the need to increase the power capability of fully electric vessels, aiming to define scenarios in which the increase of the peak propulsion power is needed to ensure the safety of operations. Proposals should cover the interface between vessels and port operations addressing the regulatory requirements, including operational procedures. Proposals should address all the following aspects: Full scale demonstration of innovative solutions for extended range and extended battery cycles beyond simple scaling up of existing commercial batteries. Solutions to increase the current operational range of electric vessels to at least 150 nm (or 277.8 KM for inland navigation) for short-sea shipping, ferries, offshore of 400-6500 GT vessels, or 86-135 meters for inland river vessels on free-flowing rivers upstream, allowing rapid in route charging and being applicable to representative operating conditions of the chosen ship. Demonstration of the vessel’s economic viability in normal operation. Demonstrations should also consider baseline reference which are already state of the art Identifying the operational profiles and services that require higher energy output for safe and effective operation, developing solutions and modelling scenarios to ensure safe and efficient energy management and navigation taking into account the battery pack and recharging possibilities. Incorporating energy-efficiency measures, including but not limited to, efficient AC-DC grid, thermal management, high voltage electrical components, energy management and energy modelling for optimal operation. Implementation of vessel‑wide adaptive energy‑management solutions that coordinate battery, propulsion and hotel loads, maximising cycle life while minimising emissions. Development of solutions for intelligent and optimized battery management to improve energy efficiency and life extension of the batteries. Furthermore, projects should consider life cycle aspects by design and address the end-of-life of batteries to ensure full electric operation during and beyond the planned operation of the vessel. Creating concepts for rapid zero-emission in-route charging, fast charging, offshore charging or battery replenishment, including solutions capable of supplying power to idling vessels anchored offshore near ports, while maintaining desired operating schedules, adhering to current standards. Encouraging modular design and ship retrofitting to facilitate replication of the solution, ideally presenting one full retrofit exercise and several replications in similar or different vessels, also including the needs of the OPS infrastructure. Development of recommendations and best practices for the safety assessment of the novel installations based on field testing. This should build on established safety guidelines and requirements such as the Guidance on the Safety of Battery Energy Storage Systems onboard ships (from the European Maritime Safety Agency – EMSA) and the requirements for fixed and swappable batteries on inland vessels (from the European Committee For Drawing Up Standards In The Field Of Inland Navigation – CESNI), as applicable, and contribute to their applicability to a wider scope of novel electrification solutions. Furthermore, recommendations for improving the guidelines and extending them to the demonstrated new battery installation solutions should be presented. Regulatory aspects for the pertinent safety-critical ship systems as well as fire safety solutions for the battery room should also be addressed. In addition, the recommendations should also consider how integration of the safety considerations affects the overall operational planning and economic assessments. The plan for exploitation and dissemination of results should identify adequate business cases and provide roadmap for the replication and deployment of the proposed technology, including plans for scalability, commercialization, and deployment. Proposals should identify and propose opportunities for further market uptake. Establishment of strong collaboration between industry, training providers and higher education institutions to develop specialized courses on enhanced waterborne transport battery management. Proposals must justify the contribution of their objectives, results, intellectual property (IP) management and exploitation strategy to the EU added value creation and strategic autonomy throughout the supply and value chain, including competitiveness of the EU waterborne industry, enhancement of the EU’s R&I capacity, technological know-how capabilities and human capital, and resilience of the EU industrial and manufacturing base. Proposals are encouraged to prioritise shipyards, equipment manufacturers and suppliers located in the EU and EEA. This topic implements the co-programmed European Partnership on ‘Zero Emission Waterborne Transport’ (ZEWT). As such, projects resulting from this topic will be expected to report on results to the European Partnership ‘Zero…
Technology readiness, as published
Activities are expected to achieve TRL 8 by the end of the project – see General Annex B. Activities may start at any TRL.
Other topics in HORIZON-CL5-2027-03
- HORIZON-CL5-2027-03-D5-03 — Data-driven circular economy for e-mobility ecosystem (2ZERO Partnership)
- HORIZON-CL5-2027-03-D5-04 — Demonstration of zero emission coaches and buses in long distance operations…
- HORIZON-CL5-2027-03-D5-05 — Higher Voltage, Megawatt Charging System compatible, modular powertrain for…
- HORIZON-CL5-2027-03-D5-06 — Fire prevention and mitigation for EVs in confined areas (2ZERO Partnership)
- HORIZON-CL5-2027-03-D5-08 — Sustainable aircraft circular design and additive manufacturing, towards a…
- HORIZON-CL5-2027-03-D5-14 — Onboard renewable energy solutions and energy saving measures to reduce the…
- HORIZON-CL5-2027-03-D5-15 — Prospective evaluation of nuclear power potential for shipping (ZEWT…
- HORIZON-CL5-2027-03-D5-16 — Autonomous vessels in short sea shipping and inland waterways
- HORIZON-CL5-2027-03-D5-17 — Innovative Solutions for mitigating the environmental impact of waterborne…
- HORIZON-CL5-2027-03-D5-20 — Assessing the effect of airport operations on air quality and noise in nearby…
Source and attribution
Topic text from the official topic page on the EU Funding & Tenders Portal, retrieved 19 October 2026. © European Union, reused under Commission Decision 2011/833/EU (CC BY 4.0). Changes: the expected outcomes and impacts are split into numbered statements, long passages are shortened, and the evaluator checklist is GrantWise's own commentary. Your call and the Work Programme always win; check them before you submit. GrantWise is independent and not affiliated with, endorsed by, or acting on behalf of the European Commission.