GrantWise
Synthetic demonstration · fictional applicant

Innowwide Market Feasibility Project assessment

A native Innowwide example treating the application and mandatory workplan as one six-month, one-country market-entry experiment.

EIC Stage 1EIC Stage 2EurostarsInnowwide
Independent pre-submission simulation

COLDCHAIN AI · Market-entry feasibility review

Assessment of the country hypothesis, local subcontractor, evidence-generating activities, workplan, costs and month-six decision.

ProgrammeInnowwide
Target countryKenya
Material reviewedApplication + workplan
ConfidenceHigh for consistency
Shortened structural preview: An actual paid report is substantially longer and more detailed. This sample shows how the review is organised and written, while a real report contains more sub-criterion analysis, application–workplan reconciliation, findings, evidence tracing and proposal-specific corrections. COLDCHAIN AI, its subcontractor and every figure are fictional. Live-call eligibility, country restrictions and platform confirmations must always be checked before submission.

Native scorecard and independent thresholds

Excellence · threshold 1821 / 30 · passes

The local uncertainty is credible, but the comparison is not buyer-specific.

Impact · threshold 2422 / 40 · fails

The market-entry decision lacks measurable commercial thresholds.

Implementation · threshold 1819 / 30 · passes

The partner is relevant, but the activity–budget chain contains mismatches.

Threshold readiness: Not ready in the current version because Impact is below 24/40. The 62/100 total does not compensate for a failed criterion.

Competitive positioning: Weak-to-moderate. The proposal could pass thresholds after repair but still needs a sharper reason why this evidence plan should rank above other feasible market-entry studies.

Eligibility and administrative preflight

SignalEvidence in dossierAssessment
One target country / six monthsKenya; M1–M6 in application and workplan.Clear
Exact independent local subcontractorKenCold Research Ltd named with activities and budget.Present
Invitation and commitment/declarationEmail acceptance mentioned; platform declaration not evidenced.Confirm before submission
Eligible cost / fixed-grant logic€87,400 total cost; €60,000 grant; SME share stated.Cash bridge needs evidence
Ethics self-assessment“No issues” stated in narrative; form completion not evidenced.Complete every mandatory field
Target-country eligibilityAssumed from geography.Verify against live call and restrictions

Market-entry experiment map

Hypothesis / uncertaintyActivityEvidenceDecision threshold
Small exporters will pay for predictive spoilage alerts.20 buyer interviews and willingness-to-pay test.Interview log and price-response table.No minimum paid-intent threshold stated
The model transfers to intermittent-connectivity conditions.Three-site technical pilot.Prediction error and uptime dataset.Error ≤8%; uptime ≥95%
Data processing can meet local requirements.Legal/regulatory assessment.Compliance route and data-flow map.“Acceptable risk” is not defined
A local service channel can support deployments.Partner/channel workshops.Partner shortlist.No capability or commercial acceptance gate

Four-way outcome: The dossier mentions “go/no-go” but does not define the intermediate outcomes adapt and continue or further R&D. As written, valuable partial evidence could not be translated into a disciplined investment decision.

Highest-priority findings and repairs

Threshold-criticalImpact · Market access

The final market-entry decision has no commercial evidence threshold

Locations
Application Impact 3; workplan Activities 2 and 5; Outcome table
Evidence
The proposal promises a go/no-go decision after interviews and workshops. It does not state the minimum number of qualified buyers, paid-pilot intent, acceptable acquisition cost or channel commitment required to enter.
Score effect
The evaluator cannot judge whether the activities lead to an evidence-based route into the market or merely generate a report.
Correction
Define enter, adapt, further-R&D and no-entry thresholds. Connect every commercial activity to one measured output and one decision consequence.
Re-review test
A month-six decision can be made mechanically from the stated technical, commercial, regulatory and channel evidence.
Model-answer pattern: “Enter if [N] qualified buyers include [N] paid-pilot commitments at €[price], technical error is ≤[X], and [regulatory condition] is met. Adapt if [condition]; further R&D if [condition]; do not enter if [condition].”
High priorityImplementation · Consistency

The application, workplan and budget describe different partner workloads

Locations
Application Activity 3; workplan WP2; budget lines 7–10
Evidence
The application assigns field recruitment and pilot operation to KenCold. WP2 assigns recruitment to the SME, and the budget contains subcontractor cost only for legal analysis and workshops.
Score effect
The exact subcontractor contribution, activity ownership and cost logic cannot all be true at once.
Correction
Create one master activity register with identical activity name, dates, owner, output and cost; copy it into the application, workplan/Gantt and budget.
Re-review test
Every selected activity has one owner, one evidence output and one traceable cost in all documents.
Criterion-moving gapExcellence · Competitive advantage

“40% better” is not tied to a named comparator or buyer result

Location
Application Excellence 2
Evidence
The applicant claims 40% higher prediction accuracy than “existing tools” without naming a product, baseline dataset, test conditions or operational consequence for a Kenyan exporter.
Correction
Compare named alternatives and the current manual workaround on a common dataset and translate the result into spoilage, inspection time or margin relevance for the target buyer.
Re-review test
The advantage contains comparator, metric, source, conditions and buyer value.

Application–workplan–budget consistency audit

ActivityApplicationWorkplanBudgetVerdict
Buyer discoveryM1–M2 · KenColdM1–M2 · SMESME labour onlyBroken owner
Technical pilotM2–M5 · jointM3–M5 · jointBoth partiesStart date mismatch
Regulatory analysisM1–M3 · KenColdM1–M3 · KenColdSubcontractorCoherent
Decision workshopM6 · jointM6 · jointTravel + labourCoherent; add decision gates

Three strengths

  1. A credible one-country technical and commercial uncertainty.
  2. A named local subcontractor with relevant cold-chain access.
  3. A bounded six-month technical pilot with measurable performance thresholds.

Revision order

  1. Define the complete four-way market-entry decision and commercial gates.
  2. Reconcile the activity register, workplan, Gantt, owners and budget.
  3. Evidence the comparator and buyer-level value.
  4. Close platform declaration, ethics, target-country and cash-bridge confirmations.

This synthetic assessment is not an official Eureka eligibility decision, ranking prediction or substitute for checking the live Innowwide call and submission platform.

Review your Innowwide dossier

Upload the application and mandatory workplan together so the evidence, activities, owners, dates and costs can be reconciled.

Get my free score preview →